MV Systems
Complete turn-key solution from LV to MV system upgrade
- 1. Consultation services with Professional Engineer
- 2. Application, liaison and runner submission to TNB
- 3. Assist in load and maximum demand calculation and schematic drawing preparation
- 4. Supply & Installation of associated switchgear: Transformer (TX), Vacuum Circuit Breakers (VCB)
- 5. Supply & Installation of new MSB panel / sub DB panels
- 6. Associated wiring works, termination & supervised shutdown
- 7. Subsequent maintenance works, troubleshoot of HT system (on call/breakdown) if required
- 8. Submission of application as HT user to Suruhanjaya Tenaga
- 9. Assist in obtaining a competent person/chargeman
Testing & certifications
- 1. Vacuum Circuit Breaker (VCB) test
- 2. Calibration of OCR and ELR
- 3. Contact Resistance Test
- 4. Timing Test
- 5. Transformer (TX) Test
- 6. Winding Test
- 7. Ratio Test
- 8. Insulation Test
- 9. Vector Group Test
- 10. Polarization Index Test
- 11. Tan Delta Test
- 12. Pressure Test
- 13. Servicing & Overhaul of OLTC
- 14. Filtration of Transformer Oil after Oil Integrity Test
Competent Persons & SLD
- 1. BO Chargeman
- 2. AO, A1, A2, A3, A4 Chargeman
- 3. PW4 Wireman
- 4. Schematic Line Diagram of Switchboard